News

[24.12.2008]

"Ekol Engineering Services" CJSC is going to meet New Year with worthy presentation.
The Director General of "Ekol Engineering Services" CJSC in an interview with daily "Iki Sahil".
Soltan Aliyev        - Mr. Soltan, first of all I'd like to congratulate you and your working associates on the occasion of 31th of December the day of Solidarity of Azerbaijani in the World and wish Happy New Year.
Thanks. I also on behalf of my company associates would like to congratulate you and Azeri people on this occasion. Wish all peace and public tranquility and happiness, as well as all call on Azerbaijani to firmly implement progressive ideas of the National Leader of Azerbaijan Haydar Aliyev and for order's sake of Independence, social and political, economical and cultural development of the Republic of Azerbaijan we should closely unite around the President of Azerbaijan Mr. Ilham Aliyev and I wish the coming 2009 year would become successful.
       - Could you please give brief information about necessity of the company establishment and its activity?
       With a great pleasure, as you know in period of the Soviet Union Power oil operating processes were carried out scattered, negatively impacting to the environment and of course it did not pass away Azerbaijan as an oil country where it showed itself enormously increased.
       Only after our country achieved Independence and returning back home out National Leader Haydar Aliyev all spheres started to grow and ecology field was not left out of attention development processes started on and many required decrees on this improvement were assumed. In the meanwhile after Mr. Ilham Aliyev became the president of the Republic of Azerbaijan he gave a range of important decrees for improvement of ecological position in Azerbaijan especially in oil operating and exploration sites.
       Corresponding to the President decree dated on 28 of September 2008 about improvement of ecological position in Azerbaijan there were fulfilled many required activities to create the "Complex Action Plan" for 2006-2010 years which stated as a very important issues for SOCAR.
       Taking all these into consideration there was need to create appropriate organizations that would meet al requirements of International Standards for successful implementation of environmental projects at the same to succeed in involving foreign investors in this business to be fulfilled in all operating sites of SOCAR.
EKOL        That became the reason to establish "Ekol Engineering Services": Closed Joint Stock Company which was founded by SOCAR (51%) and a foreign Investor "Lancer - S.A" Environmental-Consulting Company (49%). The Company has been awarded with TSE-ISO-14001 International Certificate.
       The main purpose of the company is to carry out treatment processes of industrial and wastewater, treatment and utilization of oily slope, recultivation and remediation of oily contaminated soil, prepare and work out ecological and normative-technical documentations, carrying out ecological monitoring works, implementation of complex laboratory services, greenery works, installation of sprinkler and other kind of engineering services.
       - What kind of ecological projects has your Company succeeded in fulfilling for activity period?
Starting from 2006 year the company has fulfilled a range of ecological projects in operating sites of SOCAR. Treatment up to nominative level all the industrial and waste water formed during technical processes in Baku Refinery named after Haydar Aliyev and "Azneftyagh" Refinery as well as treatment and utilization of oil slope by means of modern methods and technologies have always been the main activity focuses.
       Alongside, there were prepared many technical normative documents for organizations and companies under SOCAR and more 30 companies have been provided with monitoring works and laboratory services. In operating site of OGPB called as "Bibiheybetneft" there was implemented remediation work of oily contaminated soil in more than 50 ha area.
       There is also Wax (paraffin) treatment site where in relevance with the contract signed with BP Caspian Exploration process wax received from operating sites of BP Company is continuously treated.
       - With which companies do you cooperate?
       As I noted our cooperation relations are basically developed with companies under SOCAR, besides, business relations are made with foreign companies.
       BP Caspian Corporation Ltd, "Surakhani Oil" Operation Company S.A, "Facet International" Germany, "Oswald Shultz", "Emscher Genossenchaft", "Project Engineering Wincker Gmdh", Alfa Laval Sweden, "Intecha" Czech Republic, "Ekonodragment" and many companies are considered highly potential partners.
       Except this, the company has signed cooperation agreements with ecological companies in Poland, Turkmenistan and Uzbekistan.
       - How did the 2008 year mark for your company?
       I suppose this year will be remembered with some portentous events. I was re-appointed the Director General of this Company in march month of the current year. Since that period there have been many positive structural changes where required department were established. They are following:
       Ecological Monitoring Department, Waste Treatment Department and Soil Remediation Department and other sub structural sections. As well as remediation works of oily contaminated soil started on and positive results were achieved.
       At the expenses of the foreign founder there were purchased 2 (two) modern kind of decanters for oil slope treatment powered by ALFA LAVAL Company. These decanters were installed in operating sites of "Bibiheybetneft" and Baku Refinery named after Haydar Aliyev and put into operation. This year we also have finished construction and installation works for waste water treatment plant of "FACET International" Germany and we participated at exhibitions within country as well as abroad like the "POLEKO" International Trade Exhibition held in Poznan city, Poland.
       - Has the World Financial Crisis influenced on your Company?
       Certainly, the global problem did not pass our country. Corresponding oil price fall down and some financial problems SOCAR has decided to stop down some companies' activities, of course as Sub Company of SOCAR "Ekol" met some financial problems in its potential activities as well.
       In spite of all these issues our company being supported by the foreign investor is still continuing its progressive activities in required spheres.
       I believe that, intellectually and professionally progressive stuff will keep trying the best in order to save our priority in this issue and jointly to cope with the Global Financial Crisis.
       - More traditional question... What could you tell about your further plans?
       Implementation of large scale ecological projects by "Ekol Engineering Services" CJSC is not issue only within the Country but abroad as well, we have a goal to introduce the company to all potentially based organizations meeting International Standards requirements all over the world.
       With the view of this, in a very short period the company has succeeded in creating high potential and qualified specialists stuff, very strong technical and financial base, and achieving the mutual business relations with foreign ecological companies.
       In order to develop and expand foreign economical relations and improve financial state of the company it's expected to carry out joint projects with foreign companies and establish required representatives in Caspian countries.
       - Thank you, Mr. Soltan for finding time to this meeting, and giving us broad and interesting information about company. Wish your company great successes in further business activities and wish this year to bring a lot of good luck to your life.
       Thank you, in my turn I also wish all the same, and Happy New year.
 


As long as the Indenpended Republic of Azerbaijan and Azeri Nation exist Haydar Aliyev will live in hearts.

[4.02.2010]
"AAS - EKOL" Limited Company has been founded by "Ekol Engineering Services" CJSC and "AA Services" Companies ...

[3.02.2010]
Fire protection and HSE trainings held in the company ...

[2.02.2010]
Ekol football team is holding trainings ...

[29.01.2010]
Production conference regarding to execution of upcoming projects ...

[28.01.2010]
Business meeting with the representatives of IT ECO Engineering Co.Ltd, Japan ...

[25.01.2010]
Ekol has started up execution of new projects in the frame of Measurement Plans regarding to "Year of Ecology" event ...

[22.01.2010]
Ekol wins again ...

[21.01.2010]
Match between Ekol and Galakt football teams finished with score 17:0 ...

[19.01.2010]
Memorial ceremony of Faith Martyrs of 20th January ...

[19.01.2010]
2010 is going to be a year of execution of a number of environmental projects ...

[14.01.2010]
Newly constructed boiler house is ready for operation ...

[11.01.2010]
Competitions for Azerbaijan Cup started up ...

[8.01.2010]
Exploration of oil sludge specifications is one of the main factors of processing technologies ...

[7.01.2010]
"Ekol Engineering Services" CJSC has successfully completed 2009 year. ...

[28.12.2009]
Business relationship between "Ekol Engineering Services" CJSC And "Uzbekgazneft" National Holding Company is in progress ...

[26.12.2009]
"Ekol Engineering Services' CJSC is continuing measurements regarding "The year of Ecology" ...

[21.12.2009]
"Ekol Engineering Services" CJSC has been awarded ...

[15.12.2009]
Land recultivation project execution in operational site of "Salyan Oil" Ltd has been successfully over ...

[2.12.2009]
Sensational match score between Ekol and Saray football teams ...

[25.11.2009]
Business meeting with Japanese and Taiwan specialists in "Ekol Engineering Services" CJSC ...

[20.11.2009]
HSE trainings held in the company ...

[18.11.2009]
Environmental policy of "Ekol Engineering Services" CJSC is in progress ...

[13.11.2009]
Convenient conditions for "Ekol Engineering Services" CJSC and BAMAG for creation of mutual business relations ...

[8.10.2009]
Electro mechanical department has carried out required preparation efforts for winter season ...

[29.09.2009]
The representative of "Ekol Engineering Services" CJSC has been awarded the diploma of honor of SOCAR ...

[28.09.2009]
HSE rules are the most important to act in "Ekol Engineering Services" CJSC ...

[25.09.2009]
"Ekol Engineering Services" CJSC representatives participated in the International Congress "Energy, Ecology and Economy" ...

[16.09.2009]
"Ekol Engineering Services" CJSC meets worthy the "Oil Workers Day" and 15th jubilee of "Contract of the century" ...

[9.09.2009]
Second separation pit of the treatment plants has been put into operation again ...

[7.09.2009]
According to 20 September "Oil Workers Day" and 15th anniversary of "Project of Century" there was a Saturday working day in "Ekol Engineering Services" CJSC ...

[26.08.2009]
Ekol mini football team holds serious trainings for the next championship ...

[13.08.2009]
"Ekol Engineering Services" CJSC has started to a new Project on improving ecological position ...

[10.08.2009]
Economical relations between "Ekol Engineering Services" CJSC and "Tetra Tech Inc" USA is widely increasing ...

[6.08.2009]
"Ekol Engineering Services" CJSC makes convenient conditions for summer holiday of employees ...

[3.08.2009]
The first stage of remediation woks implemented in operational sites of Salyan Oil Ltd have been over ...

[30.07.2009]
"Ekol Engineering Services" CJSC has been accepted as a member of American Chamber of Commerce ...

[28.07.2009]
Complex Researching Laboratory of "Ekol Engineering Services" CJSC is developing the range of its activities ...

[27.07.2009]
The contract of "Alliance Establishment" to be executed ...

[24.07.2009]
Japanese specialists got familiarized with operational sites of "Ekol Engineering Services" CJSC ...

[22.07.2009]
Bilateral cooperation between Azerbaijan and Uzbekistan Republics is in progress ...

[17.07.2009]
"Ekol Engineering Services" CJSC has been awarded the diploma of honor at backgammon tournament held among Oil and Gas Industries ...

[14.07.2009]
Transport and special equipment department of "Ekol Engineering Services" CJSC has succesfully passed the first six months of 2009 year ...

[9.07.2009]
Greenery work are progressively implemented in operational sites of "Ekol Engineering Services" CJSC ...

[29.06.2009]
Armed Forces Day of Azerbaijan Republic was celebrated in "Ekol Engineering Services" CJSC ...

[25.06.2009]
Construction works of boiling house are in progress ...

[23.06.2009]
First report and election conference of Union Committee held in "Ekol engineering Services" Closed Joint Stock Company ...

[19.06.2009]
A group of representatives from "Ekol Engineering Services" CJSC was away on Business Trip in Vietnam Socialist Republic ...

[16.06.2009]
"SURFACE ACTIVE SOLUTIONS" Company from Great Britain held and exhibition in the office of "Ekol Engineering Services" CJSC ...

[12.06.2009]
15th of June Salvation Day has been celebrated in "Ekol Engineering Services" CJSC ...

[13.05.2009]
Business meeting with TETRA TECH Company Representatives in the head office of "Ekol Engineering Services" CJSC ...

[13.05.2009]
"Ekol" football team has defeated TT football team with score 9:8 ...

[12.05.2009]
"Ekol Engineering Services" CJSC visited secondary school 158 in Yasamal region and school for disabled children ...

[8.05.2009]
86 Anniversary of National Leader of Azerbaijan Haydar Aliyev has been celebrated ...

[4.05.2009]
"Ekol Engineering Services" CJSC held Saturday work in order to improve fire safety in site ...

[1.05.2009]
Report about implemented works by Ecological Monitoring Department in the first quarter of 2009 ...

[30.04.2009]
The match meeting between "Ekol" and "Khanbulan" football teams finished with 19:4 ...

[29.04.2009]
Safe work is everyone's privileges ...

[23.04.2009]
"Ekol engineering Services" CJSC has been appointed a member of German Azerbaijan Business Association ...

[22.04.2009]
Business visit of Vietnam "Vimexco" Company representatives in "Ekol Engineering Services" CJSC ...

[20.04.2009]
"Ekol Engineering Services" CJSC held Saturday work in order to improve fire safety in site ...

[17.04.2009]
"Ekol" and "Garabagh Veterans" football teams match meeting finished with 4:4 ...

[15.04.2009]
Meeting with the representatives of "Vimexco" Company held in head office of "Ekol Engineering Services" CJSC ...

[13.04.2009]
"Ekol Engineering Services" CJSC held a cleaning day on Saturday ...

[13.04.2009]
Practical trainings are held in operational sites of "Ekol Engineering Services" CJSC ...

[10.04.2009]
"Ekol Engineering Services" CJSC has been awarded "Caspian Energy Integration Award-2009" ...

[9.04.2009]
Fire occurred in Baku Oil Refinery named after Haydar Aliyev ...

[7.04.2009]
The first quarter of 2009 has been over succesfully ...

[6.04.2009]
13th round of Azerbaijan Football Championship has started ...

[3.04.2009]
Implemented works in operational fields of Salyan Oil Ltd in the first quarter is satisfactory ...

[1.04.2009]
Remembering ceremony of tragedy 31st of March.The day of genocide of Azerbaijan people ...

[31.03.2009]
Construction works of a new steam boiler house in "Ekol Engineering Services" CJSC ...

[29.03.2009]
Backgammon competition held in "Ekol Engineering Services" CJSC ...

[29.03.2009]
Activities are continuously carried out on improving and renovation of waste water treatment facilities in "Ekol Engineering Services" CJSC ...

[14.03.2009]
Improvement of new technologies in "Ekol Engineering Services" CJSC is implemented together with foreign specialists ...

[12.03.2009]
"Ekol Engineering Services" Closed Joint Stock Company participated on community work day in operational sites Bibi Haybat OGPB ...

[6.03.2009]
Ekol Engineering Services CJSC will vote with approval at the referendum ...

[6.03.2009]
Ekol Engineering Services CSJC has celebrated 8th of March International Ladies Day ...

[3.03.2009]
Round table meeting has been held on 3 year anniversary of Ekol Engineering Services CJSC ...

[2.03.2009]
The football match between team "Ekol" and "Olimp" has ended with score 8:2 ...

[28.02.2009]
Contract of an Alliance establishment between "Ekol Engineering Services" CJSC and "Ekonodragment" Joint Venture successfully signed ...

[26.02.2009]
Ekol Engineering Services CJSC has hold memorable ceremony of Khodjali tragedy ...

[23.02.2009]
3rd Period of Azerbaijan Football Championship has started ...

[20.02.2009]
The representatives of "Ekol Engineering Services" CJSC were away on business trip in Uzbekistan Republic. ...

[18.02.2009]
Training seminars are held in "Ekol Engineering Service" CJSC ...

[16.02.2009]
Ekol Engineering Services is to hold exhibition in Uzbekistan Republic ...

[12.02.2009]
Recultivation works have been carried out in operational sites of SALYAN OIL Ltd ...

[11.02.2009]
New Brazilian footballer is going to start his game in our team ...

[6.02.2009]
Trainings continuously held in site N7 of Ekol Engineering Services CJSC ...

[5.02.2009]
New members of New Azerbaijan Party in Ekol Engineering Services have been awarded the party membership cards ...

[5.02.2009]
BP representatives were satisfied with wax treatment process results ...

[3.02.2009]
Required arrangements on planting of greenery are implemented in operational sites of the company ...

[2.02.2009]
First month of the New Year has been over successfully ...

[29.01.2009]
Monitoring works have been carried out in operational sites of Salyan Oil Company ...

[27.01.2009]
Recently following trainings on safety have been held in "Ekol Engineering Services" CJSC ...

[26.01.2009]
"Ekol" football team is coming final threshold ...

[22.01.2009]
Normative documents are worked out with the modern kind of softwares. ...

[21.01.2009]
Memory of martyrs for faith on 20th of January ...

[19.01.2009]
The representative of Ekol Company was away on business trip in the Republic of China city Guang Dong ...

[15.01.2009]
Soil Recultivation Department of CJSC implemented a number of projects in 2008 ...

[13.01.2009]
Young specialists have been awarded the certificate ...

[13.01.2009]
"Ekol" Leadership meets the representative of "Saman" South Korea ...

[7.01.2009]
Waste treatment department obtained complete satisfaction implementing works in December last year ...

[30.12.2008]
View from inauguration ceremony of "Ekol Engineering Services" CJSC (Babek ave.10B) held on 29th of December 2009 ...

[30.12.2008]
Official inauguration ceremony of head office building of EKOL Engineering Services Closed Joint Stock Company ...

[24.12.2008]
"Ekol Engineering Services" CJSC is going to meet New Year with worthy presentation ...

[18.12.2008]
Electro-mechanical section of the CJSC acts in a non-stop work regime ...

[17.12.2008]
Expanding the technical services of Transport department of Ekol Engineering Services CJSC ...

[15.12.2008]
Vice-president of SOCAR Mukhtar Babayev and General Director of "Ekol Engineering Services" CJSC Soltan Aliyev were out on the business trip Dashkend city. ...

[12.12.2008]
"Ekol Engineering Services" CJSC held a memory ceremony of National Leader. ...

[10.12.2008]
NAP "EKOL" has held the first territorial organization conference ...

[10.12.2008]
Practical training held for members of voluntary in Ekol Engineering Services CJSC ...

[5.12.2008]
Design and apply of new technologies department of Ekol Engineering Services is expanding cooperation area ...

[4.12.2008]
Greenery works and work conditions improvement are developing on the territory of Ekol Engineering Services CJSC ...

[3.12.2008]
Wastes Treatment Department of CJSC realized successfully activities planned for November of the current year ...

[1.12.2008]
The second period of Republic Championship on mini football has started. ...

[1.12.2008]
Lancer -S.A Environmental Consulting Company holds an exhibition of implemented project ...

[26.11.2008]
Recent production conference took place in a new office building of Ekol Engineering Services Closed Joint Stock Company. ...

[25.11.2008]
Oil sludge treatment with the latest technology is implemented in "Azerneftyag" ORF ...

[20.11.2008]
"Ekol" mini football team is seriously preparing for the second tour of the championship ...

[19.11.2008]
The cooperation between "Ekol Engineering Services" CJSC and "Ekonordragment" Company is developing ...

[18.11.2008]
"Ekol Engineering Services" CJSC is realizing new ecological projects with foreign companies ...

[17.11.2008]
The new office of Ekol Engineering Services Closed Joint Stock Company has already been put into operation ...

[6.11.2008]
"Rehabilitation of Contaminated Soils - suggested methods" conference has taken place ...

[3.11.2008]
The first period of mini football championship is terminated ...

[30.10.2008]
The international exhibition POLEKO 2008 is going on ...

[28.10.2008]
"Ekol Engineering Services" CJSC stuff is to take part at the international exhibition. ...

[27.10.2008]
Mini football team Ekol has gained a victory over TT(Baku) with the score of 7 to 1 ...

[23.10.2008]
Complex Survey Laboratory of CJSC "Ekol Engineering Services" is continuing investigation on hard metals determination ...

[22.10.2008]
Experienced and venerable scholar of oil production holds seminars with young specialists of CJSC ...

[22.10.2008]
"Ekol Engineering Services" CJSC is SOCAR's potential Contractor in the field of ecological normative and technical documentation preparation ...

[21.10.2008]
"Ekol Engineering Services" CJSC's general director Soltan Aliyev was sent on an official visit in Uzbekistan by "EKONORDRAGMENT" Company's invitation ...

[20.10.2008]
"Ekol" mini football team paves successfully its further way towards victory...

[9.10.2008]
The special technique plays an important role in ecological projects realization...

[8.10.2008]
Trainings on Civil Defense were held at "Ekol Engineering Services" CJSC...

[7.10.2008]
"Ekol Engineering Services" Closed Joint Stock Company's external ties are expanding...

[6.10.2008]
The match between "Ekol" and "Araz" teams ended with the score of 3:3 ...

[3.10.2008]
"Ekol Engineering Services" CJSC General Director's business trip to Cairo is over...

[2.10.2008]
"Mini football team "Ekol" played a match with the team "Azmet"...

[2.10.2008]
Ramadan was pompously celebrated in "Ekol Engineering Services" CJSC...

[26.09.2008]
"Ekol Engineering Services" CJSC's personnel supports internal and external policy of our Republic...

[25.09.2008]
The trainings on Civil Defense were held in CJSC "Ekol Engineering Services"...

[25.09.2008]
The assembly of the new treating plant is terminated on the territory of ORF "Azerneftyag"...

[24.09.2008]
CJSC "Ekol Engineering Services" has widespread social ties....

[23.09.2008]
The general Director of "Ekol Engineering Services" will be sent on an official business trip in Cairo,Egypt with the purpose of acquainting with the newest technology...

[22.09.2008]
"Ekol Engineering Services" participated at the exhibition dedicated to the Oilmen Day...

[22.09.2008]
"Ekol" mini football team played a match with "Azersun"s team "Kharabakh"...

[22.09.2008]
The General Director of CJSC "EKOL" Soltan Aliyev was interviewed for "Businessmen" magazine. The interview is presented in its original form...

[19.09.2008]
Activities on installation and improvement of new technology during oil-slime treatment process are being realized...

[18.09.2008]
The 20th of September is the National Oilmen Day...

[16.09.2008]
Investigations on oil-slime ecological characteristics are being continued...

[15.09.2008]
Investigation studies on oil-slime ecological characteristics are being conducted...

[12.09.2008]
The new laboratory equipment was checked...

[12.09.2008]
CJSC "Ekol Engineering Services" received an invitation from the French company "Association OtherWays Management and Consulting - France"...

[11.09.2008]
The International Conference came to an end...

[10.09.2008]
The monthly technical safety on industrial areas was held in CJSC "Ekol"...

[3.09.2008]
"CJSC EKOL Engineering Services" became a participant of Azerbaijan national Exhibition 2008...

[2.09.2008]
"EKOL" mini football team met with Nahchivan team "ARAZ"...

[2.09.2008]
Estimated and Designed Documentation of Building and Assembly Jobs is being Successfully implemented...

[29.08.2008]
Greeneries contribute to the improvement of environmental conditions...

[27.08.2008]
Pumps of new type were put into operation...

[25.08.2008]
EKOL CJSCs representatives participated in seminars in Germany...

[18.08.2008]
Ekol is enlarging the sphere of activity...

[14.08.2008]
The company financial and technical base is continuously increased...

[12.08.2008]
Applying new kind of technologies enables to successfully carry out ecological projects for "Ekol Engineering Services" CJSC...

[11.08.2008]
The company football team is to participate at the International Tournament...

[8.08.2008]
Electro-mechanical section...

[6.08.2008]
Successfully completed the month...

[5.08.2008]
Achievement of positive results in operational sites by applying new technologies...

[4.08.2008]
Applying of the newest company logo...

[1.08.2008]
The company football team is getting ready for the country championship...

[31.07.2008]
"Ekol Engineering Services" CJSC is to take part in an important event...

[30.07.2008]
Preparing of ecological technical documents is carried out professionally...

[29.07.2008]
A new water treatment plant has been tested...

[29.07.2008]
The director general of "Ekol Engineering Services" CJSC mister Soltan Aliyev became a holder of Patent for an invention of a new plant...

[28.07.2008]
Electricity system is periodically renewed...

[25.07.2008]
Transport system and special techniques of "Ekol Engineering Services" CJSC are continuously enhanced. ...

[24.07.2008]
"Ekol Engineering Services" CJSC is successfully continuing co-operation with BP Operating Company ...

[23.07.2008]
Future co-operation plans between "Ekol Engineering Services" CJSC and "Ecology Department" of SOCAR...

[23.07.2008]
"Ekol Engineering Services" CJSC is establishing and developing foreign relationships...

[22.07.2008]
Baku Oil Refinery named after Haydar Aliyev is provided with periodical water supply ...

[21.07.2008]
"Ekol Engineering Services" CJSC takes an active part in social life of the Republic...

[18.07.2008]
Planting of greenery in operating sites of "Ekol Engineering Service" CJSC...

[17.07.2008]
A new plant to be installed in Refinery "Azerneftyagh"...

[16.07.2008]
The management structure of "Ekol Engineering Services" CJSC is intending to replace to the new building...

[16.07.2008]
Works carried out in Bibiheybet are kept in the focus ...

[15.07.2008]
Rest days for the company employees is still going on...

[15.07.2008]
Anniversary of Kamil Akhundov has been celebrated in "Ekol Engineering Services" CJSC...

[11.07.2008]
Preparing of specialists in ecology sphere has become demand of the day...

[09.07.2008]
"Ekol Engineering Services" CJSC is intending to put into operation a new treatment plant...

[07.07.2008]
"Ekol Engineering Services" CJSC has completed this month successfully...

[04.07.2008]
Hereby "Ekol Engineering Services" CJSC is offering following services...

[03.07.2008]
HES knowledge of "Ekol Engineering Services" CJSC personnel is highly improved according to International Standards...

[01.07.2008]
Director General of "Ekol Engineering Services" CJSC Soltan Aliyev on the business visit in Germany from 25 - to 29 of JUNE...

[25.06.2008]
"Ekol Engineering Services" CJSC employees are highly provided with soft summer rest...

[20.06.2008]
Treatment of industrial waste water sets up a firm base environment improving...

[16.06.2008]
Football team of "Ekol Engineering Services" CJSC is assirtivly getting ready to the Republic Championship...

[10.06.2008]
The recovery process of oily contaminated soil is carried out in operational site of "BiBihaybat" of OGPB...

[05.06.2008]
Apply of new technologies has given effective result...

[04.06.2008]
"Ekol Engineering Services" CJSC participates at 15th Anniversary International CASPIAN OIL & GAS EXHIBITION Incorporating Refining & Petrochemicals...

[25.05.2008]
"Ekol Engineering Services" CJSC builds its business corresponding to International Standards...

About structure changes in "Ekol Engineering Services" Closed Joint Stock Company...

On 08 may 2008 in "Ekol Engineering Services" Closed Joint Stock Company there was held a meeting dedicated to 85 year jubilee of Great National Leader of Azerbaijan Haydar Aliyev. The chief of Nizami district organization of New Azerbaijan Party Shukur Mehrabov, representative of administration of the party as well, deputy director of Baku Oil Refinery named after Haydar Aliyev Rafig Mamedov and "Ekol Engineering Services" Management participated at the meeting...

As a tribute to 85 year jubilee of Great National Leader of Azerbaijan Haydar Aliyev there was held an ceremonial inauguration of new treatment plants in site of "Ekol Engineering Services" Closed Joint Stock Company. The President of State Oil Company of Azerbaijan Republic Rovnag Abdullayev, Vice-presidents Davud Mamedov, Mukhtar Babayev, Khalig Mamedov and other representatives participated at the ceremony...

In the first quarter of 2008 for oil sludge treatment processing there were purchased 2 (two) module decanters LUNX 40 (2 phase) powered by Alfa Laval with productivity 30 m3/h. One of decanters was installed in an oil operating field Bibihaybatneft of OGPM and the second installed and put into operation in site 9 of Baku Oil Refinery named after Haydar Aliyev...

“Ekol Engineering Services” CJSC made up its business...

In 2006 "Ekol Engineering Services" CJSC created a

Corresponding to the President Decree...

"Ekol Engineering Services" CJSC and BP Operation Company...

Footbal team of "Ekol Engineering Services" CJSC won the...