|
News
[2.02.2009]
First month of the New Year has been over successfully
Oil strategy founded by the National Leader of Azerbaijan Haydar Aliyev is successfully implemented and fulfilled and it plays a very noticeable role in developing of sociable power and convenient living conditions of the people.
Alongside with this progress, we take into consideration the fact of importance of environment safety there were fulfilled a number of environmental projects in relevance with the President decree on improving ecological position in Azerbaijan
Based on modern technologies and world wide experience as well as mutual business relations with international companies the company has succeeded in completing the month with high results at the beginning of the year.
In January month from Baku Oil Refinery there has been treated 830 000 m3 waste water, in "Azernetyagh" 720 000 m3 industrial waste water and has been handed over to Oil Refinery for re-use, about 207 tones of oil slope has been treated and utilized, 31 m3 of Pigging Wax delivered from BP Exploration (Caspian Sea) has been treated.
New pipelines, pumps and required technologies have been provided in operational sites of the company and some renovation works have been carried out and new waste water treatment plants Facet ha put in operation. This modern plant with power 1200 will enable to treat up industrial waste water, fecal water up to required normative level and reduce hazardous waste and negative impact to the environment.
Last month execution works carried out on implementing the Drilling Waste Treatment in operational sites of "Salyan Oil" LTD "Garabaghli" and "Kursengi" sites.
Successfully gained results serve as a background for the further progressive achievements of the company.
|
|