Recultivation works have been carried out in operational sites of SALYAN OIL Ltd
According to the contract signed between "Ekol Engineering Services" CJSC and "Salyan Oil" Ltd by Soil Recultivation Department of Ekol there has been carried out a utilization works of drilling slope in operational sites of "Salyan Oil" Ltd named as Kursengi and Garabaghli. With this reason there have been involved a number of special kind of equipments.
At the first stage of process by means of bio-remediation methods in order to utilize slope accumulated in KN-store it was transformed to temporally based store with 4 ha size and soil filling works in KN store has been over.
Currently in SL-3 store there are carried out drilling sludge transportation works. In Kursengi field by "Client" 1 ha area has been defined for start up process.
Waste Treatment Department inspide of everything carries out all the works in nonstop regime in relevance with the calendar plan of the project and the company intends to successfully over the project within appointed time.
As long as the Indenpended Republic of Azerbaijan and Azeri Nation exist Haydar Aliyev will live in hearts.