News

[22.09.2008]

The General Director of CJSC "EKOL" Soltan Aliyev was interviewed for "Businessmen" magazine. The interview is presented in its original form.
Soltan Aliyev
       - One of the philosophers compared the human life with the book, pages of which are written by himself. Tell us, please, which significant events occurred on the pages of your book?
       - Very interesting question. Various significant events did take place in my life the same as in the lives of other people. The most interesting period of my life is the years of my studying at the university.
       The most significant and interesting moments of my life are connected with my activity in SOCAR. I always feel a sense of pride for establishing "Ekol Engineering Services" and Ecology management of SOCAR. Each success of my company and personnel is my own success and significant event.
       One of the most bearing in mind events was the participation of SOCAR's president Rovnaq Abdullayev in the ceremony of putting into operation a new oil-slime treatment plant. The other interesting moments are the works held in Bibieybat area.
       - Please, tell us about "EKOL"s establishment?
       - In the course of many years, in Azerbaijan, wastes, formed in the process of oil and gas production, brought lands and water pools to the contamination. One of the important issues today is the solution of ecological problems. This problem is especially evident on the Apsheron peninsula.
       With the purpose of environmental conditions improvement, the necessity of establishing joint ventures of new type aroused. It will contribute to the SOCAR's ecological projects implementation and will involve foreign investors to these activities.
       With that very necessity, CJSC "EKOL Engineering Services" was established on 1st March 2006 according to the agreement signed between SOCAR(51%) and foreign investor Lancer Environmental Consulting(49%).
       In short terms, "EKOL", on the expenses of foreign investor created strong material and technical base, purchased new technology and received the licenses of state authorities and international certificates TSE- ISO- EN 14001. Qualified specialists and engineers are employed at the enterprise.
       - Your company plays a significant role in modern world. Tell us, please, about EKOL's activity? What is it occupied with?
       - The main purpose of our company is the maintenance of healthcare and environment. EKOL offers the following services: wastewater treatment, oil-slime processing, reclamation and remediation of oily lands, preparing of ecological and technical documentation, ecological monitoring activities, complex laboratory services; assembly of waterfalls, fountains, irrigation and implementation of greenery works; planting trees, flowers, and bushes; soil analysis, its organic and non-organic fertilizers.
       - In September it will be 2 full years from the day when Ilham Aliyev, president of Azerbaijan Republic, signed a decree about state ecological program realization. Which issues of this document contain the basis of EKOL ?
       - This decree "On environmental conditions improvement" and "Complex Activities Schedule" was examined carefully by our company. The solution of major part of ecological problems fell to SOCAR's lot.
       CJSC "EKOL", acting according to the "Complex Activities Schedule", with the purpose of minimizing oil-slime and wastewaters negative impact on the environment, purchased on the expenses of foreign investors modern technology; and began works on oily lands treatment on the territory of Bibieybat.
       In more than 30 organizations belonging to SOCAR ecological directed activities are being implemented. On Hovsan and Bibieybat areas the conditions of treating plants construction were observed and examined.
       - Azerbaijan, from the view of gaining independence, is a young enough state. For this very reason, I think that there should be a lot of works in the field of ecology. Have you ever consulted world experience? And is your company cooperating with other foreign companies?
       - Our company relies on the latest achievements of science and world experience in this field. I want to underline particularly that I am proud of our republic having such a rich and skilled personnel. Our company is closely cooperating with these specialists, and in the case of necessity, gets them involved into the ecological projects realization.
       The problem of ecology is a global problem; and it is possible to say that the problems existed in our country nowadays are equal with the ecological problems existed in other countries. Taking it into the consideration, we always observe carefully world countries achievements and experience.
       In this direction we lead close partnerships with such famous companies as "Facet", "Oswald Shuts", "Emscher Genossenschaft", "Projekt Engineering Wincker Gmdh", "Alfa-Laval", "BP" and so on.
       Moreover, our company is planning to begin partnership with Caspian States and open there its representations. It will lead to strengthening of economic ties and ecological projects realization.
       - Bibieybat is an area with a significant role in oil production. Do u have any perspectives regarding this region? Did u hold any works there?
       - I consider myself a happy personbecause I lived at the same time with our national leader H.Aliyev, and was the witness and participant of our republic's construction.
       With H.Aliyev's coming to power in 1993, spiritual and moral values of our nation began to gain its former popularity.
       In 1994, during Gurban holiday, H.Aliyev visited mosque in Bibieybat, and despite of economic difficulties, gave order to build a new one in this area. On the 12th of July 2008 Ilham Aliyev participated in the opening of newly built mosque.
       With the purpose of improving existing catastrophic situation in Bibieybat, I.Aliyev issued an edict on implementation a number of complex activities in this area. Such was a beginning of Bibieybat territory reclamation.
       "EKOL" is holding intensive ecological activities in this area.
       First of all, monitoring activities were held, and level of land pollution was measured. Our company was given a task to treat about 526 hectares of oily lands.
       At the moment "Ekol" is occupied with the treatment of the most contaminated part of the Bibieybat area - "Kovsh".
       You know all these aroused special interest in me. I am willing to shoot a documentary film, revealing the splendor of our wise leaders' ideas, the renaissance of spirituality and nature, the miracles created by the human labor.
       - Very interesting idea. How this film is presented to your mind ?
       - This documentary film will be shoot in professional studio with the approximate duration of 30-45minutes. The Bibieybat of the past and the Bibieybat of the nowadays will be the main part of the film. The ideas of our great leader, H.Aliyev , about morality and nature renaissance will find its expression in the film.
       - We wish you success in the realization of this interesting idea.
       - Thank you very much.
       - One of the wise men said "in order to believe in charity one must be involved in it." It will be interesting to know which issues embrace the social program of your company.
       - The solution of the social problems of employees and the individual approach to them is one of the main tasks put in front of our company.
       Rovnaq Abdullayev, SOCAR's president says that "employees must come to work with pleasure because a kindly staff and good conditions are waiting for them; and must go home with the same feeling of pleasure because they bring income into the family." This idea is being successively implemented by our enterprise.
       Our employees are provided with the conditions meeting the requirements of European standards. Recreation is organized in the best regions of our republic in summer. Favorable conditions are created for sportive and cultural activities. The employees are provided with daily free feed and milk ; checked up annually, and if necessity arises, they are provided with free medical treatment and financial support.
       Mini football club is functioning in the company and repeatedly was a winner in various competitions and championships.
       At present the team is preparing for the national championship. Our only aim is victory.
       - What gifts does "Ekol" celebrate The Oilmen Day with?
       - Our company celebrates this holiday with a special festivities.
       In the second half of the current year "Ekol" purchased 2phased decanter (Alfa-Laval) with the power of 30 m3/h.One of them was installed on the territory of ORF "Azerneftyag" and the other on the territory of BORF named after H.Aliyev. Moreover, the treating plant "Facet" has been purchased for wastewater treatment. This plant will be put into the operation on the eve of the holiday.
       "Ekol" will participate in the social and political life of Azerbaijan and during the upcoming elections will vote for the H.Aliyev's political course.
       - Finally, let me wish you and every employee of your company success in this responsible and virtuous mission realization.
       - Thank you very much.

 


As long as the Indenpended Republic of Azerbaijan and Azeri Nation exist Haydar Aliyev will live in hearts.

[4.02.2010]
"AAS - EKOL" Limited Company has been founded by "Ekol Engineering Services" CJSC and "AA Services" Companies ...

[3.02.2010]
Fire protection and HSE trainings held in the company ...

[2.02.2010]
Ekol football team is holding trainings ...

[29.01.2010]
Production conference regarding to execution of upcoming projects ...

[28.01.2010]
Business meeting with the representatives of IT ECO Engineering Co.Ltd, Japan ...

[25.01.2010]
Ekol has started up execution of new projects in the frame of Measurement Plans regarding to "Year of Ecology" event ...

[22.01.2010]
Ekol wins again ...

[21.01.2010]
Match between Ekol and Galakt football teams finished with score 17:0 ...

[19.01.2010]
Memorial ceremony of Faith Martyrs of 20th January ...

[19.01.2010]
2010 is going to be a year of execution of a number of environmental projects ...

[14.01.2010]
Newly constructed boiler house is ready for operation ...

[11.01.2010]
Competitions for Azerbaijan Cup started up ...

[8.01.2010]
Exploration of oil sludge specifications is one of the main factors of processing technologies ...

[7.01.2010]
"Ekol Engineering Services" CJSC has successfully completed 2009 year. ...

[28.12.2009]
Business relationship between "Ekol Engineering Services" CJSC And "Uzbekgazneft" National Holding Company is in progress ...

[26.12.2009]
"Ekol Engineering Services' CJSC is continuing measurements regarding "The year of Ecology" ...

[21.12.2009]
"Ekol Engineering Services" CJSC has been awarded ...

[15.12.2009]
Land recultivation project execution in operational site of "Salyan Oil" Ltd has been successfully over ...

[2.12.2009]
Sensational match score between Ekol and Saray football teams ...

[25.11.2009]
Business meeting with Japanese and Taiwan specialists in "Ekol Engineering Services" CJSC ...

[20.11.2009]
HSE trainings held in the company ...

[18.11.2009]
Environmental policy of "Ekol Engineering Services" CJSC is in progress ...

[13.11.2009]
Convenient conditions for "Ekol Engineering Services" CJSC and BAMAG for creation of mutual business relations ...

[8.10.2009]
Electro mechanical department has carried out required preparation efforts for winter season ...

[29.09.2009]
The representative of "Ekol Engineering Services" CJSC has been awarded the diploma of honor of SOCAR ...

[28.09.2009]
HSE rules are the most important to act in "Ekol Engineering Services" CJSC ...

[25.09.2009]
"Ekol Engineering Services" CJSC representatives participated in the International Congress "Energy, Ecology and Economy" ...

[16.09.2009]
"Ekol Engineering Services" CJSC meets worthy the "Oil Workers Day" and 15th jubilee of "Contract of the century" ...

[9.09.2009]
Second separation pit of the treatment plants has been put into operation again ...

[7.09.2009]
According to 20 September "Oil Workers Day" and 15th anniversary of "Project of Century" there was a Saturday working day in "Ekol Engineering Services" CJSC ...

[26.08.2009]
Ekol mini football team holds serious trainings for the next championship ...

[13.08.2009]
"Ekol Engineering Services" CJSC has started to a new Project on improving ecological position ...

[10.08.2009]
Economical relations between "Ekol Engineering Services" CJSC and "Tetra Tech Inc" USA is widely increasing ...

[6.08.2009]
"Ekol Engineering Services" CJSC makes convenient conditions for summer holiday of employees ...

[3.08.2009]
The first stage of remediation woks implemented in operational sites of Salyan Oil Ltd have been over ...

[30.07.2009]
"Ekol Engineering Services" CJSC has been accepted as a member of American Chamber of Commerce ...

[28.07.2009]
Complex Researching Laboratory of "Ekol Engineering Services" CJSC is developing the range of its activities ...

[27.07.2009]
The contract of "Alliance Establishment" to be executed ...

[24.07.2009]
Japanese specialists got familiarized with operational sites of "Ekol Engineering Services" CJSC ...

[22.07.2009]
Bilateral cooperation between Azerbaijan and Uzbekistan Republics is in progress ...

[17.07.2009]
"Ekol Engineering Services" CJSC has been awarded the diploma of honor at backgammon tournament held among Oil and Gas Industries ...

[14.07.2009]
Transport and special equipment department of "Ekol Engineering Services" CJSC has succesfully passed the first six months of 2009 year ...

[9.07.2009]
Greenery work are progressively implemented in operational sites of "Ekol Engineering Services" CJSC ...

[29.06.2009]
Armed Forces Day of Azerbaijan Republic was celebrated in "Ekol Engineering Services" CJSC ...

[25.06.2009]
Construction works of boiling house are in progress ...

[23.06.2009]
First report and election conference of Union Committee held in "Ekol engineering Services" Closed Joint Stock Company ...

[19.06.2009]
A group of representatives from "Ekol Engineering Services" CJSC was away on Business Trip in Vietnam Socialist Republic ...

[16.06.2009]
"SURFACE ACTIVE SOLUTIONS" Company from Great Britain held and exhibition in the office of "Ekol Engineering Services" CJSC ...

[12.06.2009]
15th of June Salvation Day has been celebrated in "Ekol Engineering Services" CJSC ...

[13.05.2009]
Business meeting with TETRA TECH Company Representatives in the head office of "Ekol Engineering Services" CJSC ...

[13.05.2009]
"Ekol" football team has defeated TT football team with score 9:8 ...

[12.05.2009]
"Ekol Engineering Services" CJSC visited secondary school 158 in Yasamal region and school for disabled children ...

[8.05.2009]
86 Anniversary of National Leader of Azerbaijan Haydar Aliyev has been celebrated ...

[4.05.2009]
"Ekol Engineering Services" CJSC held Saturday work in order to improve fire safety in site ...

[1.05.2009]
Report about implemented works by Ecological Monitoring Department in the first quarter of 2009 ...

[30.04.2009]
The match meeting between "Ekol" and "Khanbulan" football teams finished with 19:4 ...

[29.04.2009]
Safe work is everyone's privileges ...

[23.04.2009]
"Ekol engineering Services" CJSC has been appointed a member of German Azerbaijan Business Association ...

[22.04.2009]
Business visit of Vietnam "Vimexco" Company representatives in "Ekol Engineering Services" CJSC ...

[20.04.2009]
"Ekol Engineering Services" CJSC held Saturday work in order to improve fire safety in site ...

[17.04.2009]
"Ekol" and "Garabagh Veterans" football teams match meeting finished with 4:4 ...

[15.04.2009]
Meeting with the representatives of "Vimexco" Company held in head office of "Ekol Engineering Services" CJSC ...

[13.04.2009]
"Ekol Engineering Services" CJSC held a cleaning day on Saturday ...

[13.04.2009]
Practical trainings are held in operational sites of "Ekol Engineering Services" CJSC ...

[10.04.2009]
"Ekol Engineering Services" CJSC has been awarded "Caspian Energy Integration Award-2009" ...

[9.04.2009]
Fire occurred in Baku Oil Refinery named after Haydar Aliyev ...

[7.04.2009]
The first quarter of 2009 has been over succesfully ...

[6.04.2009]
13th round of Azerbaijan Football Championship has started ...

[3.04.2009]
Implemented works in operational fields of Salyan Oil Ltd in the first quarter is satisfactory ...

[1.04.2009]
Remembering ceremony of tragedy 31st of March.The day of genocide of Azerbaijan people ...

[31.03.2009]
Construction works of a new steam boiler house in "Ekol Engineering Services" CJSC ...

[29.03.2009]
Backgammon competition held in "Ekol Engineering Services" CJSC ...

[29.03.2009]
Activities are continuously carried out on improving and renovation of waste water treatment facilities in "Ekol Engineering Services" CJSC ...

[14.03.2009]
Improvement of new technologies in "Ekol Engineering Services" CJSC is implemented together with foreign specialists ...

[12.03.2009]
"Ekol Engineering Services" Closed Joint Stock Company participated on community work day in operational sites Bibi Haybat OGPB ...

[6.03.2009]
Ekol Engineering Services CJSC will vote with approval at the referendum ...

[6.03.2009]
Ekol Engineering Services CSJC has celebrated 8th of March International Ladies Day ...

[3.03.2009]
Round table meeting has been held on 3 year anniversary of Ekol Engineering Services CJSC ...

[2.03.2009]
The football match between team "Ekol" and "Olimp" has ended with score 8:2 ...

[28.02.2009]
Contract of an Alliance establishment between "Ekol Engineering Services" CJSC and "Ekonodragment" Joint Venture successfully signed ...

[26.02.2009]
Ekol Engineering Services CJSC has hold memorable ceremony of Khodjali tragedy ...

[23.02.2009]
3rd Period of Azerbaijan Football Championship has started ...

[20.02.2009]
The representatives of "Ekol Engineering Services" CJSC were away on business trip in Uzbekistan Republic. ...

[18.02.2009]
Training seminars are held in "Ekol Engineering Service" CJSC ...

[16.02.2009]
Ekol Engineering Services is to hold exhibition in Uzbekistan Republic ...

[12.02.2009]
Recultivation works have been carried out in operational sites of SALYAN OIL Ltd ...

[11.02.2009]
New Brazilian footballer is going to start his game in our team ...

[6.02.2009]
Trainings continuously held in site N7 of Ekol Engineering Services CJSC ...

[5.02.2009]
New members of New Azerbaijan Party in Ekol Engineering Services have been awarded the party membership cards ...

[5.02.2009]
BP representatives were satisfied with wax treatment process results ...

[3.02.2009]
Required arrangements on planting of greenery are implemented in operational sites of the company ...

[2.02.2009]
First month of the New Year has been over successfully ...

[29.01.2009]
Monitoring works have been carried out in operational sites of Salyan Oil Company ...

[27.01.2009]
Recently following trainings on safety have been held in "Ekol Engineering Services" CJSC ...

[26.01.2009]
"Ekol" football team is coming final threshold ...

[22.01.2009]
Normative documents are worked out with the modern kind of softwares. ...

[21.01.2009]
Memory of martyrs for faith on 20th of January ...

[19.01.2009]
The representative of Ekol Company was away on business trip in the Republic of China city Guang Dong ...

[15.01.2009]
Soil Recultivation Department of CJSC implemented a number of projects in 2008 ...

[13.01.2009]
Young specialists have been awarded the certificate ...

[13.01.2009]
"Ekol" Leadership meets the representative of "Saman" South Korea ...

[7.01.2009]
Waste treatment department obtained complete satisfaction implementing works in December last year ...

[30.12.2008]
View from inauguration ceremony of "Ekol Engineering Services" CJSC (Babek ave.10B) held on 29th of December 2009 ...

[30.12.2008]
Official inauguration ceremony of head office building of EKOL Engineering Services Closed Joint Stock Company ...

[24.12.2008]
"Ekol Engineering Services" CJSC is going to meet New Year with worthy presentation ...

[18.12.2008]
Electro-mechanical section of the CJSC acts in a non-stop work regime ...

[17.12.2008]
Expanding the technical services of Transport department of Ekol Engineering Services CJSC ...

[15.12.2008]
Vice-president of SOCAR Mukhtar Babayev and General Director of "Ekol Engineering Services" CJSC Soltan Aliyev were out on the business trip Dashkend city. ...

[12.12.2008]
"Ekol Engineering Services" CJSC held a memory ceremony of National Leader. ...

[10.12.2008]
NAP "EKOL" has held the first territorial organization conference ...

[10.12.2008]
Practical training held for members of voluntary in Ekol Engineering Services CJSC ...

[5.12.2008]
Design and apply of new technologies department of Ekol Engineering Services is expanding cooperation area ...

[4.12.2008]
Greenery works and work conditions improvement are developing on the territory of Ekol Engineering Services CJSC ...

[3.12.2008]
Wastes Treatment Department of CJSC realized successfully activities planned for November of the current year ...

[1.12.2008]
The second period of Republic Championship on mini football has started. ...

[1.12.2008]
Lancer -S.A Environmental Consulting Company holds an exhibition of implemented project ...

[26.11.2008]
Recent production conference took place in a new office building of Ekol Engineering Services Closed Joint Stock Company. ...

[25.11.2008]
Oil sludge treatment with the latest technology is implemented in "Azerneftyag" ORF ...

[20.11.2008]
"Ekol" mini football team is seriously preparing for the second tour of the championship ...

[19.11.2008]
The cooperation between "Ekol Engineering Services" CJSC and "Ekonordragment" Company is developing ...

[18.11.2008]
"Ekol Engineering Services" CJSC is realizing new ecological projects with foreign companies ...

[17.11.2008]
The new office of Ekol Engineering Services Closed Joint Stock Company has already been put into operation ...

[6.11.2008]
"Rehabilitation of Contaminated Soils - suggested methods" conference has taken place ...

[3.11.2008]
The first period of mini football championship is terminated ...

[30.10.2008]
The international exhibition POLEKO 2008 is going on ...

[28.10.2008]
"Ekol Engineering Services" CJSC stuff is to take part at the international exhibition. ...

[27.10.2008]
Mini football team Ekol has gained a victory over TT(Baku) with the score of 7 to 1 ...

[23.10.2008]
Complex Survey Laboratory of CJSC "Ekol Engineering Services" is continuing investigation on hard metals determination ...

[22.10.2008]
Experienced and venerable scholar of oil production holds seminars with young specialists of CJSC ...

[22.10.2008]
"Ekol Engineering Services" CJSC is SOCAR's potential Contractor in the field of ecological normative and technical documentation preparation ...

[21.10.2008]
"Ekol Engineering Services" CJSC's general director Soltan Aliyev was sent on an official visit in Uzbekistan by "EKONORDRAGMENT" Company's invitation ...

[20.10.2008]
"Ekol" mini football team paves successfully its further way towards victory...

[9.10.2008]
The special technique plays an important role in ecological projects realization...

[8.10.2008]
Trainings on Civil Defense were held at "Ekol Engineering Services" CJSC...

[7.10.2008]
"Ekol Engineering Services" Closed Joint Stock Company's external ties are expanding...

[6.10.2008]
The match between "Ekol" and "Araz" teams ended with the score of 3:3 ...

[3.10.2008]
"Ekol Engineering Services" CJSC General Director's business trip to Cairo is over...

[2.10.2008]
"Mini football team "Ekol" played a match with the team "Azmet"...

[2.10.2008]
Ramadan was pompously celebrated in "Ekol Engineering Services" CJSC...

[26.09.2008]
"Ekol Engineering Services" CJSC's personnel supports internal and external policy of our Republic...

[25.09.2008]
The trainings on Civil Defense were held in CJSC "Ekol Engineering Services"...

[25.09.2008]
The assembly of the new treating plant is terminated on the territory of ORF "Azerneftyag"...

[24.09.2008]
CJSC "Ekol Engineering Services" has widespread social ties....

[23.09.2008]
The general Director of "Ekol Engineering Services" will be sent on an official business trip in Cairo,Egypt with the purpose of acquainting with the newest technology...

[22.09.2008]
"Ekol Engineering Services" participated at the exhibition dedicated to the Oilmen Day...

[22.09.2008]
"Ekol" mini football team played a match with "Azersun"s team "Kharabakh"...

[22.09.2008]
The General Director of CJSC "EKOL" Soltan Aliyev was interviewed for "Businessmen" magazine. The interview is presented in its original form...

[19.09.2008]
Activities on installation and improvement of new technology during oil-slime treatment process are being realized...

[18.09.2008]
The 20th of September is the National Oilmen Day...

[16.09.2008]
Investigations on oil-slime ecological characteristics are being continued...

[15.09.2008]
Investigation studies on oil-slime ecological characteristics are being conducted...

[12.09.2008]
The new laboratory equipment was checked...

[12.09.2008]
CJSC "Ekol Engineering Services" received an invitation from the French company "Association OtherWays Management and Consulting - France"...

[11.09.2008]
The International Conference came to an end...

[10.09.2008]
The monthly technical safety on industrial areas was held in CJSC "Ekol"...

[3.09.2008]
"CJSC EKOL Engineering Services" became a participant of Azerbaijan national Exhibition 2008...

[2.09.2008]
"EKOL" mini football team met with Nahchivan team "ARAZ"...

[2.09.2008]
Estimated and Designed Documentation of Building and Assembly Jobs is being Successfully implemented...

[29.08.2008]
Greeneries contribute to the improvement of environmental conditions...

[27.08.2008]
Pumps of new type were put into operation...

[25.08.2008]
EKOL CJSCs representatives participated in seminars in Germany...

[18.08.2008]
Ekol is enlarging the sphere of activity...

[14.08.2008]
The company financial and technical base is continuously increased...

[12.08.2008]
Applying new kind of technologies enables to successfully carry out ecological projects for "Ekol Engineering Services" CJSC...

[11.08.2008]
The company football team is to participate at the International Tournament...

[8.08.2008]
Electro-mechanical section...

[6.08.2008]
Successfully completed the month...

[5.08.2008]
Achievement of positive results in operational sites by applying new technologies...

[4.08.2008]
Applying of the newest company logo...

[1.08.2008]
The company football team is getting ready for the country championship...

[31.07.2008]
"Ekol Engineering Services" CJSC is to take part in an important event...

[30.07.2008]
Preparing of ecological technical documents is carried out professionally...

[29.07.2008]
A new water treatment plant has been tested...

[29.07.2008]
The director general of "Ekol Engineering Services" CJSC mister Soltan Aliyev became a holder of Patent for an invention of a new plant...

[28.07.2008]
Electricity system is periodically renewed...

[25.07.2008]
Transport system and special techniques of "Ekol Engineering Services" CJSC are continuously enhanced. ...

[24.07.2008]
"Ekol Engineering Services" CJSC is successfully continuing co-operation with BP Operating Company ...

[23.07.2008]
Future co-operation plans between "Ekol Engineering Services" CJSC and "Ecology Department" of SOCAR...

[23.07.2008]
"Ekol Engineering Services" CJSC is establishing and developing foreign relationships...

[22.07.2008]
Baku Oil Refinery named after Haydar Aliyev is provided with periodical water supply ...

[21.07.2008]
"Ekol Engineering Services" CJSC takes an active part in social life of the Republic...

[18.07.2008]
Planting of greenery in operating sites of "Ekol Engineering Service" CJSC...

[17.07.2008]
A new plant to be installed in Refinery "Azerneftyagh"...

[16.07.2008]
The management structure of "Ekol Engineering Services" CJSC is intending to replace to the new building...

[16.07.2008]
Works carried out in Bibiheybet are kept in the focus ...

[15.07.2008]
Rest days for the company employees is still going on...

[15.07.2008]
Anniversary of Kamil Akhundov has been celebrated in "Ekol Engineering Services" CJSC...

[11.07.2008]
Preparing of specialists in ecology sphere has become demand of the day...

[09.07.2008]
"Ekol Engineering Services" CJSC is intending to put into operation a new treatment plant...

[07.07.2008]
"Ekol Engineering Services" CJSC has completed this month successfully...

[04.07.2008]
Hereby "Ekol Engineering Services" CJSC is offering following services...

[03.07.2008]
HES knowledge of "Ekol Engineering Services" CJSC personnel is highly improved according to International Standards...

[01.07.2008]
Director General of "Ekol Engineering Services" CJSC Soltan Aliyev on the business visit in Germany from 25 - to 29 of JUNE...

[25.06.2008]
"Ekol Engineering Services" CJSC employees are highly provided with soft summer rest...

[20.06.2008]
Treatment of industrial waste water sets up a firm base environment improving...

[16.06.2008]
Football team of "Ekol Engineering Services" CJSC is assirtivly getting ready to the Republic Championship...

[10.06.2008]
The recovery process of oily contaminated soil is carried out in operational site of "BiBihaybat" of OGPB...

[05.06.2008]
Apply of new technologies has given effective result...

[04.06.2008]
"Ekol Engineering Services" CJSC participates at 15th Anniversary International CASPIAN OIL & GAS EXHIBITION Incorporating Refining & Petrochemicals...

[25.05.2008]
"Ekol Engineering Services" CJSC builds its business corresponding to International Standards...

About structure changes in "Ekol Engineering Services" Closed Joint Stock Company...

On 08 may 2008 in "Ekol Engineering Services" Closed Joint Stock Company there was held a meeting dedicated to 85 year jubilee of Great National Leader of Azerbaijan Haydar Aliyev. The chief of Nizami district organization of New Azerbaijan Party Shukur Mehrabov, representative of administration of the party as well, deputy director of Baku Oil Refinery named after Haydar Aliyev Rafig Mamedov and "Ekol Engineering Services" Management participated at the meeting...

As a tribute to 85 year jubilee of Great National Leader of Azerbaijan Haydar Aliyev there was held an ceremonial inauguration of new treatment plants in site of "Ekol Engineering Services" Closed Joint Stock Company. The President of State Oil Company of Azerbaijan Republic Rovnag Abdullayev, Vice-presidents Davud Mamedov, Mukhtar Babayev, Khalig Mamedov and other representatives participated at the ceremony...

In the first quarter of 2008 for oil sludge treatment processing there were purchased 2 (two) module decanters LUNX 40 (2 phase) powered by Alfa Laval with productivity 30 m3/h. One of decanters was installed in an oil operating field Bibihaybatneft of OGPM and the second installed and put into operation in site 9 of Baku Oil Refinery named after Haydar Aliyev...

“Ekol Engineering Services” CJSC made up its business...

In 2006 "Ekol Engineering Services" CJSC created a

Corresponding to the President Decree...

"Ekol Engineering Services" CJSC and BP Operation Company...

Footbal team of "Ekol Engineering Services" CJSC won the...