|
News
[6.08.2008] SUCCESSFULLY COMPLETED THE MONTH
"Ekol Engineering Services" CJSC has successfully fulfilled all the process works according to plans for July in 2008.
In the reported month having treated up to normal level all incoming waste water with quantity 1 million m3 from production sites of Baku Oily Refinery to the mechanical treatment plants in site N 7 of Waste Treatment Department and industrial waste water coming from "Azernetfyagh" Refinery with quantity 934 m3 the company has transformed some part of the treated water to recycle systems of the refineries but the rest to the biological treatment plants.
At the same time the company has succeeded in fully treating 7820 tones of oil slope formed during waste water treatment processes as well as long ago formed in sites of "Azernetfyagh" Refinery.
From June 19 to July 17 of the current year by the Soil Recultivation Department stuff there was recultivated more than 8.7 oily contaminated soils in site of "Bibiheybet".
In July by Ecological Monitoring Department 3 (three) required technical normative documents have been prepared for the organizations under SOCAR, as well having carried out a range of ecological monitorings in7 (seven) organizations the company has provided the Client with an optimal offer list and 5 (five) organizations have been serviced for analytical laboratory needs.
|
|